Articles Tagged “Contract Development”
5 articles tagged “Contract Development”, newest first.
-
An Introduction to ADRs (Architecture Decision Records) — The Minimal Way to Record 'Why We Designed It This Way' on a Small Team
Code never explains why it was written that way. We cover how to use an ADR (Architecture Decision Record) — one decision, one Markdown file — to preserve th...
-
Don't Forget to Decide 'How Many Seconds Is Fast Enough' — Organizing Non-Functional Requirements With IPA's Non-Functional Requirements Grade
Disputes like 'it's too slow' or 'we didn't expect that failure response' usually trace back to non-functional requirements nobody decided on. This article e...
-
Should Contracted Development Specs Stay in Excel? — Choosing the Right Format for Deliverables
Should the specification and design documents delivered in contracted development stay in Excel 'graph paper' format? This article works through the problems...
-
How Should You Structure a Contract Development or Operations & Maintenance Contract? — Learning the Quasi-Mandate vs. Contract-for-Work Distinction from IPA's 'Model Contract'
When you outsource system development, how should the contract be structured? Drawing on the 'Information System Model Transaction and Contract' published by...
-
Windows App Outsourcing and Contract Development: What to Sort Out Before You Ask
Before commissioning Windows app outsourcing or contract development, here is how to sort out existing software modification, device integration, COM/ActiveX...